Project,Drawing revision,Equipment module,Operating mode,Utility,Unit,Reference conditions,Normal demand,Peak demand,Simultaneous group,Required inlet condition,Quality requirement,Connection location,Supply owner,Installation owner,Verification record,Open action,Status YOUR PROJECT,TO CONFIRM,Filler,Production,Electrical,kW connected; kW running; kVA where specified,Voltage phase frequency and power factor to confirm,TO CONFIRM,TO CONFIRM,Production,Supply and protection to be approved,To approved electrical design,Drawing grid and height,TO ASSIGN,TO ASSIGN,Qualified electrical inspection,Confirm supply capacity,OPEN YOUR PROJECT,TO CONFIRM,Filler and capper,Production,Compressed control air,m3/min free air,State absolute reference pressure and temperature; not actual pipe-volume flow,TO CONFIRM,TO CONFIRM,Production,Minimum and maximum pressure at inlet under load,Air quality specification to confirm,Drawing grid and height,TO ASSIGN,TO ASSIGN,Flow and pressure test at agreed production format,Confirm pressure losses and simultaneous demand,OPEN YOUR PROJECT,TO CONFIRM,PET blower if included,Production,Blowing air,m3/min free air,Separate pressure system; supplier reference conditions and air recovery basis,TO CONFIRM,TO CONFIRM,Blowing,To approved blower and compressor specification,Product-contact suitability to confirm,Drawing grid and height,TO ASSIGN,TO ASSIGN,Blower utility record at agreed bottle format,Do not combine blindly with control air,OPEN YOUR PROJECT,TO CONFIRM,Rinser or process system,Production,Process water,m3/h,State pressure temperature and water quality basis,TO CONFIRM,TO CONFIRM,Production,Inlet pressure and temperature to confirm,Process-specific water analysis,Drawing grid and height,TO ASSIGN,TO ASSIGN,Water supply test under operating load,Separate product water from rinse consumption,OPEN YOUR PROJECT,TO CONFIRM,CIP or cleaning system,Cleaning,Water and return,m3/h,State cleaning recipe and whether other equipment produces simultaneously,TO CONFIRM,TO CONFIRM,Cleaning,Supply and return conditions to confirm,Approved cleaning process,Drawing grid and height,TO ASSIGN,TO ASSIGN,Approved cleaning cycle and drain checks,Confirm simultaneous demand and wastewater handling,OPEN YOUR PROJECT,TO CONFIRM,Cooling loop if included,Production or cleaning,Cooling,kW thermal and m3/h water,Supply and return temperatures and permitted temperature difference,TO CONFIRM,TO CONFIRM,TO CONFIRM,To equipment heat-load specification,Loop water quality to confirm,Drawing grid and height,TO ASSIGN,TO ASSIGN,Cooling performance under operating load,Do not substitute electrical kW for thermal load,OPEN YOUR PROJECT,TO CONFIRM,Steam user if included,Heating or cleaning,Steam,kg/h,Pressure temperature steam quality and condensate return basis,TO CONFIRM,TO CONFIRM,TO CONFIRM,To approved process specification,Application-specific steam quality,Drawing grid and height,TO ASSIGN,TO ASSIGN,Qualified steam and condensate checks,Local engineering approval required,OPEN YOUR PROJECT,TO CONFIRM,Drains and ventilation,All relevant modes,Drainage and heat rejection,State separate flow and heat-load units,Peak discharge chemistry temperature and room conditions,TO CONFIRM,TO CONFIRM,TO CONFIRM,To approved site design,Local environmental and safety requirements,Drawing grid and height,TO ASSIGN,TO ASSIGN,Site acceptance records,Assign local contractor scope,OPEN "Allot Tech (Suzhou) Co., Ltd.",Planning worksheet only,No equipment specifications supplied,No automatic engineering sizing,Replace every TO CONFIRM entry,Do not sum unlike units,Do not add flow values with different reference conditions,,,,,,,,,,,