FILLING MACHINE RFQ WORKSHEET — ALLOT TECH Blank buyer template | Revision 2026-09-14 Guide: https://fillingmachinechina.com/cost-quote/liquid-filling-machine-quotation-checklist/ HOW TO USE Complete known fields. Mark unknown items TO CONFIRM. Keep a versioned copy and ask each supplier to respond to the same version. This is a planning template, not a quotation, contract, equipment guarantee or completed test record. PROJECT Project reference / RFQ revision: Prepared by / date: Preferred reply channel: Destination country / site: Budget-stage or final specification: Required timing and its basis: Existing line or new project: REPEAT THIS BLOCK FOR EACH SKU SKU / product name: Product data-sheet revision: Normal and limiting filling temperatures: Viscosity / flow behavior (include measurement conditions if known): Density and its temperature basis (if required): Foam / entrained air / stringing: Maximum particle dimensions, concentration and fragility: Product-contact compatibility / safety information: Cleaning and product-recovery requirements: Target fill quantity and unit: Container material / drawing revision / sample identification: Neck finish / closure / liner / drawing revisions: Label / code area / case or shrink-pack pattern: Good containers required per shift: Shift duration / planned cleaning and changeover: Cycle or efficiency assumptions (identify exactly which losses are included): Future volume and format requirements: SCOPE MATRIX — COPY ONE ROW PER ITEM Item | required duty | included / optional / buyer supplied / excluded | responsible party | assumption or deviation | price reference if applicable Product preparation and supply: Container supply and infeed: Filling and product-contact path: Cap feeding and application: Inspection and reject verification: Labeling and coding: Packing and pallet handling: Conveyors, accumulation and controls: Format parts and cleaning accessories: Utilities, piping, wiring and site work: Documentation, training and spares: Packing, shipping, installation and commissioning: FACTORY INPUTS Layout and access drawing revision: Voltage / frequency / phase: Compressed-air and other utility availability: Product, water, drainage and cleaning supply boundaries: Equipment interfaces and responsible parties: Applicable destination requirements identified by qualified advisers: AGREED TEST BASIS — DO NOT INVENT VALUES Product or permitted substitute; limitations of substitute: Package samples and revisions: Formats and operating conditions: Observed run duration / target good output: Fill measurement method / sample count / agreed limits: Closure method / agreed checks / timing of measurement: Reject, stop/restart and changeover checks: Documents and raw records required: Open-item owner / due date / closure evidence / retest: SUPPLIER RESPONSE Proposed equipment and why it fits: Guaranteed performance and exact test basis: Supported formats and required change parts: Full utility schedule and connection points: Inclusions, options, buyer items and exclusions: Technical deviations and required samples: Currency and named delivery basis: Delivery, payment and document milestones: Service, warranty, travel, training and spare-parts scope: No information is sent automatically by this template.